Near Surface Instrument Frame

Reference Designator
CE07SHSM-RID27

No deployments found

No notes yet.

New Note

Metadata Start Date End Date Comment
CE07SHSM
12/1/17, 9:35 AM 3/25/18, 3:09 PM

Data loss due to a power system failure. The mooring stopped receiving power from photo voltaic panel 1 of 4 on Nov-2. By Nov-20, the mooring stopped receiving power from two more solar panels (PV2 & PV4) and one of two wind turbines (WT2). This indicates the Power System Controller (PSC) they connect to is failing. Mooring components will be shut down as the mooring loses the ability to recharge its batteries.

Id: 1237 By: crisien
Flag: not_operational Exclude: No