3-Axis Motion Pack

Reference Designator
GS01SUMO-SBD11-01-MOPAK0000
Start Depth
0
End Depth
0
Location
Buoy Well, center of Mass
Current Status
Engineering
Class
MOPAK (3-Axis Motion Pack)
Series
MOPAK-0
Science Discipline
Physical
Make
MicroStrain
Model
3DM-GX3-25
M2M Example
https://ooinet.oceanobservatories.org/api/m2m/12576/sensor/inv/GS01SUMO/SBD11/01-MOPAK0000/metadata
Method Data Stream Content Type
recovered_host mopak_o_dcl_accel_recovered Accelerometer Data Report M2M Engineering
recovered_host mopak_o_dcl_rate_recovered Rate Data Report M2M Engineering
telemetered mopak_o_dcl_accel Accelerometer Data Report M2M Engineering
telemetered mopak_o_dcl_rate Rate Data Report M2M Engineering
Deployment Cruise Start Date Stop Date Mooring Asset Node Asset Sensor Asset Latitude Longitude Deployment Depth Water Depth
1 Review AT-26-29 02/18/2015 12/27/2015 CGMGS-01SUMO-00001 CGINS-MOPAK0-11846 -54.4083 -89.3575 0 4611
2 Review NBP-15-11 12/14/2015 12/12/2016 CGMGS-01SUMO-00002 CGINS-MOPAK0-42297 -54.4041 -89.2069 0 4588
3 Review NBP16-10 11/25/2016 12/09/2018 CGMGS-01SUMO-00003 CGINS-MOPAK0-43264 -54.4076 -89.3567 0 4612
4 Review DY096 12/04/2018 CGMGS-01SUMO-00004 CGINS-MOPAK0-11847 -54.4072 -89.206 0 4589

No notes yet.

New Note

Metadata Start Date End Date Comment
GS01SUMO-SBD11
12/13/15, 7:00 PM 12/11/16, 7:00 PM

Upon recovery of deployment 2, damage to some components of the surface buoy were noted (e.g., FDCHP was bent, the tops of the METBK-PRC and FleetBroadBand antenna were missing).

Id: 94 By: lgarzio

GS01SUMO
12/8/17, 7:00 PM

Deployment 3: Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan.

Id: 834 By: lgarzio