Method | Data Stream | Content | Type | |
---|---|---|---|---|
recovered_host | optaa_dj_dcl_instrument_recovered | Data Products | Report M2M Stats | Science |
recovered_host | optaa_dj_dcl_metadata_recovered | Metadata | Report M2M | Engineering |
telemetered | optaa_dj_dcl_instrument | Data Products | Report M2M Stats | Science |
telemetered | optaa_dj_dcl_metadata | Metadata | Report M2M | Engineering |
Deployment | Cruise | Start Date | Stop Date | Mooring Asset | Node Asset | Sensor Asset | Latitude | Longitude | Deployment Depth | Water Depth |
---|---|---|---|---|---|---|---|---|---|---|
1 Review | AT-26-29 | 02/18/2015 | 12/27/2015 | CGMGS-01SUMO-00001 | CGINS-OPTAAD-00206 | -54.4083 | -89.3575 | 12 | 4611 | |
2 Review | NBP-15-11 | 12/14/2015 | 12/12/2016 | CGMGS-01SUMO-00002 | CGINS-OPTAAD-00255 | -54.4041 | -89.2069 | 12 | 4588 | |
3 Review | NBP16-10 | 11/25/2016 | 12/09/2018 | CGMGS-01SUMO-00003 | CGINS-OPTAAD-00150 | -54.4076 | -89.3567 | 12 | 4612 | |
4 Review | DY096 | 12/04/2018 | CGMGS-01SUMO-00004 | CGINS-OPTAAD-00254 | -54.4072 | -89.206 | 12 | 4589 |
No notes yet.
Metadata | Start Date | End Date | Comment |
---|---|---|---|
GS01SUMO |
12/8/17, 7:00 PM |
Deployment 3: Recovery of the mooring was planned during the NBP 17-09 cruise (Nov - Dec 2017) but not completed due to adverse weather conditions. Recovery options are pending. Instruments that are still operational are likely reaching (or have surpassed) their deployment lifespan. Id: 834 By: lgarzio |