Dissolved Oxygen

Reference Designator
GI03FLMA-RIS01-03-DOSTAD000
Start Depth
30
End Depth
30
Location
Sensor cage
Current Status
Unknown
Class
DOSTA (Dissolved Oxygen Stable Response)
Series
DOSTA-D
Science Discipline
Chemical
Make
Aanderaa
Model
Optode 4831
M2M Example
https://ooinet.oceanobservatories.org/api/m2m/12576/sensor/inv/GI03FLMA/RIS01/03-DOSTAD000/metadata
Method Data Stream Content Type
recovered_host dosta_abcdjm_sio_instrument_recovered Data Products Report M2M Stats Science
recovered_host dosta_abcdjm_sio_metadata_recovered Metadata Report M2M Engineering
telemetered dosta_abcdjm_sio_instrument Data Products Report M2M Stats Science
telemetered dosta_abcdjm_sio_metadata Metadata Report M2M Engineering
Deployment Cruise Start Date Stop Date Mooring Asset Node Asset Sensor Asset Latitude Longitude Deployment Depth Water Depth
1 Review KN-221-4 09/12/2014 08/18/2015 CGMGI-03FLMA-00001 CGINS-DOSTAD-00228 59.7668 -39.8425 26 2700
2 Review AT-30-01 08/18/2015 07/17/2016 CGMGI-03FLMA-00002 CGINS-DOSTAD-00465 59.7707 -39.8801 26 2689
3 Review AR-07-01 07/12/2016 08/12/2017 CGMGI-03FLMA-00003 CGINS-DOSTAD-00392 59.8177 -39.8412 30 2696
4 Review AR21 08/08/2017 06/15/2018 CGMGI-03FLMA-00004 CGINS-DOSTAD-00457 59.7699 -39.886 30 2689
5 Review AR30-03 06/10/2018 CGMGI-03FLMA-00005 CGINS-DOSTAD-00391 59.7681 -39.8425 30 2700

No notes yet.

New Note

Metadata Start Date End Date Comment
GI03FLMA
9/12/14, 4:11 PM 8/18/15, 6:41 AM

Deployment 1: Mooring was deployed 10-15m shallower than planned.

Id: 683 By: lgarzio

GI03FLMA-RIS01-03-DOSTAD000
12/12/14, 7:00 PM 8/18/15, 6:41 AM

Deployment 1: Dissolved oxygen noise increased, possibly from biofouling.

Id: 772 By: lgarzio
Flag: suspect Exclude: No

GI03FLMA
8/18/15, 7:48 PM 7/16/16, 8:00 PM

Deployment 2: Mooring was deployed 5-10m deeper than planned.

Id: 684 By: lgarzio

GI03FLMA-RIS01
1/21/16, 7:00 PM 3/28/16, 8:00 PM

Deployment 2: Secondary controller failed - no recovered_host or telemetered data expected.

Id: 689 By: lgarzio

GI03FLMA-RIS01
4/27/16, 8:00 PM 7/16/16, 8:00 PM

Deployment 2: Secondary controller failed - no leak was detected, but the battery for the controller board was drained at recovery. No recovered_host or telemetered data expected.

Id: 690 By: lgarzio

GI03FLMA-RIS01
8/30/16, 2:00 AM 8/12/17, 7:36 AM

Deployment 3: Secondary controller failed - no recovered_host or telemetered data expected.

Id: 694 By: lgarzio

GI03FLMA
8/8/17, 11:59 AM 6/15/18, 3:59 AM

Deployment 4: Mooring was deployed 5-10m deeper than planned.

Id: 1450 By: lgarzio

GI03FLMA-RIS01
6/10/18, 9:59 AM

Deployment 5: The secondary controller did not establish communications at deployment, so there will be no telemetered data from the instruments connected to this controller. The instruments should be logging internally and data should be available at recovery.

Id: 1427 By: lgarzio