pCO2 Air-Sea

Reference Designator
CE07SHSM-SBD12-04-PCO2AA000
Start Depth
0
End Depth
0
Location
Buoy Well (1 probe in air, 1 probe in water)
Current Status
Unknown
Class
PCO2A (pCO2 Air-Sea)
Series
PCO2A-A
Science Discipline
Chemical
Make
Pro-Oceanus
Model
pCO2-pro
M2M Example
https://ooinet.oceanobservatories.org/api/m2m/12576/sensor/inv/CE07SHSM/SBD12/04-PCO2AA000/metadata
Method Data Stream Content Type
recovered_host pco2a_a_dcl_instrument_air_recovered In-Air Data Products Report M2M Stats Science
recovered_host pco2a_a_dcl_instrument_water_recovered In-Water Data Products Report M2M Stats Science
telemetered pco2a_a_dcl_instrument_air In-Air Data Products Report M2M Stats Science
telemetered pco2a_a_dcl_instrument_water In-Water Data Products Report M2M Stats Science
Deployment Cruise Start Date Stop Date Mooring Asset Node Asset Sensor Asset Latitude Longitude Deployment Depth Water Depth
1 Review OC1503D 04/15/2015 09/23/2015 CGMCE-07SHSM-00001 CGINS-PCO2AA-34196 46.9861 -124.566 0.7 87
2 Review OC1510A 10/13/2015 05/13/2016 CGMCE-07SHSM-00002 CGINS-PCO2AA-35256 46.9875 -124.569 0.7 87
3 Review TN-342 05/05/2016 09/27/2016 CGMCE-07SHSM-00003 CGINS-PCO2AA-34230 46.9895 -124.569 0.7 87
4 Review AT37-03 09/20/2016 04/13/2017 CGMCE-07SHSM-00004 CGINS-PCO2AA-34199 46.9859 -124.566 0.7 87
5 Review SKQ201704S 04/11/2017 10/06/2017 CGMCE-07SHSM-00005 CGINS-PCO2AA-34230 46.9882 -124.567 0.7 89
6 Review SKQ201715S 10/03/2017 03/29/2018 CGMCE-07SHSM-00006 CGINS-PCO2AA-35256 46.9852 -124.564 0.7 87
7 Review SKQ201808S 03/25/2018 09/20/2018 CGMCE-07SHSM-00007 CGINS-PCO2AA-35259 46.9881 -124.568 0.7 87
8 Review SR1813 09/18/2018 CGMCE-07SHSM-00008 CGINS-PCO2AA-35258 46.9835 -124.564 0.7 87

No notes yet.

New Note

Metadata Start Date End Date Comment
CE07SHSM
12/1/17, 9:35 AM 3/25/18, 3:09 PM

Data loss due to a power system failure. The mooring stopped receiving power from photo voltaic panel 1 of 4 on Nov-2. By Nov-20, the mooring stopped receiving power from two more solar panels (PV2 & PV4) and one of two wind turbines (WT2). This indicates the Power System Controller (PSC) they connect to is failing. Mooring components will be shut down as the mooring loses the ability to recharge its batteries.

Id: 1237 By: crisien
Flag: not_operational Exclude: No